Shed forming machine and loom including such a machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10287712
APP PUB NO 20180023223A1
SERIAL NO

15653744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine for forming the shed of a weaving loom, of the dobby or cam machine type utilizes output levers performing, during the weaving, an alternating oscillation movement around another common shaft, a casing (12) with an output aperture crossed by the levers, as well as a frame (6) which delimits, with the casing (12), an inner volume (V) of the machine, including an area for receiving torque transmission members between a driving shaft and a shaft for actuating the output levers as well as an area for receiving the output levers, this receiving area being adjacent to the area for receiving the torque transmission members, while the frame (6) supports the actuation shaft. The casing (12) and the frame (6) are in sealed contact, via at least one seal gasket (16, 18), at both external (16) and internal (18) seal barriers (B1, B2) respectively distant from each other, both seal barriers each extending over the whole periphery of the casing (12) except at the output aperture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STAUBLI FAVERGES74210 FAVERGES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pollet, Francois Annecy le Vieux, FR 5 4
Serena, Claude Gilly sur Isere, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00