Rack, load carrier and method of production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10299593
APP PUB NO 20170311721A1
SERIAL NO

15499041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load carrier for a rack for disposition at one or more rack uprights and for receiving loads with a load bearing contact surface for the purpose of storing loads and an upright contact surface section for disposition of the load carrier at the upright or uprights, wherein the load bearing surface section extends along the length and width of the load carrier and the upright contact surface section runs along the length and height of the load carrier, wherein the load bearing surface section and the upright contact surface section are disposed transversely to each other to form a support bracket, wherein for the purpose of reinforcing the load carrier, the load bearing surface section and/or the upright contact surface section are part of a hollow profile and/or have one or more corrugations. Also, a rack with corresponding load carriers and a method for making the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WITRON LOGISTIK & INFORMATIK GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bösl, Thomas Schnaittenbach, DE 1 6
Bruckner, Günter Schnaittenbach, DE 1 6
Ketelaar, Stefan Parkstein, DE 1 6
Müller, Fabian Mantel, DE 14 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00