Crankshaft and method of strengthening shaft component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10300523
APP PUB NO 20170165742A1
SERIAL NO

15126810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crankshaft that can be strengthened in a short time without being subjected to wasteful processing, and that can be strengthened over a wide range. The crankshaft includes a crank pin and a fillet portion of a journal pin. Compressive residual stress is applied to a region on the fillet portion, which extends at almost equal distances to both sides in a circumferential direction from a portion in which the greatest bending load is applied, and a processing depth for applying the compressive residual stress is gradually decreased in a circumferential direction from the center position in which the compressive residual stress is greatest.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTD1-1 MINAMI-AOYAMA 2-CHOME MINATO-KU TOKYO 107-8556

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koshino, Daisuke Utsunomiya, JP 11 13
Miura, Daisuke Utsunomiya, JP 78 575
Takeuchi, Yutaka Sakura, JP 37 338
Tanaka, Toshiyuki Saitama, JP 304 4921
Yoshimura, Takuro Utsunomiya, JP 6 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00