Method for smelting saprolite ore

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10301704
APP PUB NO 20180030574A1
SERIAL NO

15552031

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a smelting method whereby a reaction for reducing pellets, said pellet being formed by using a saprolite ore as a starting material, can be effectively conducted and thus an iron/nickel alloy having a nickel grade of, for example, 16% or greater can be obtained. The method comprises: a pellet production step (S1) for producing the pellets from the saprolite ore; and a reduction step (S2) for heating and reducing the obtained pellets in a smelting furnace. In the pellet production step (S1), at least the saprolite ore and a preset amount of a carbonaceous reducing agent are mixed together to produce the pellets. In the reduction step (S2), a hearth carbonaceous reducing agent is preliminarily spread on the hearth of the smelting furnace and the pellets produced above are placed on the hearth carbonaceous reducing agent and then subjected to a heat reduction treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO METAL MINING CO LTDTOKYO 105-8716

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Taku Niihama, JP 35 72
Okada, Shuuji Niihama, JP 10 13
Takahashi, Junichi Niihama, JP 141 1546

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00