Control device for fuel injection valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10309336
APP PUB NO 20180010545A1
SERIAL NO

15540310

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention determines whether multi-stage injection control is operating normally or abnormally, and carries out a failsafe of multi-stage injection control as necessary. The present invention, which solves the problem described above, has means such as the following. The invention is provided with fuel injection valves provided respectively to each cylinder, an opened/closed valve detection means for detecting either one or both of an open valve state and a closed valve state of the fuel injection valves on the basis of the drive currents or drive voltages of the fuel injection valves, and a detection execution determination means for determining a detection execution time period including the detection start timing and the detection end timing of the open valve state or closed valve state; detection interference such as overlapping detection with another cylinder and overlapping of open valve detection and closed valve detection being preventable, and risks such as erroneous detection being reducible.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI AUTOMOTIVE SYSTEMS, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mukaihara, Osamu Ibaraki, JP 36 218
Toyohara, Masahiro Ibaraki, JP 48 460

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00