Quick disconnect conduit joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10315135
APP PUB NO 20170284580A1
SERIAL NO

15085852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conduit assembly of a gravity separation device having specialized joint structure for mating first and second conduits to permit easier removal of the first conduit. The first conduit may include a snout having a tube and a collar positioned at an end of the tube. The collar may include a flange extending outward from a center of the tube. The second conduit may have a main body and a saddle at an end of the main body. The saddle may include a track shaped to receive the flange of the collar of the first conduit. The saddle may also have a resiliently separable gateway comprising two opposing projections configured for receiving therebetween and partially enclosing the tube of the snout.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHIER PRODUCTS COMPANY6455 WOODLAND DRIVE SHAWNEE KS 66218

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Benjamin F Overland Park, US 5 8
Ismert, Charles M Kansas City, US 3 8
Ismert, Luke J Prairie Village, US 4 10
Ismert, Martin B Prairie Village, US 4 26
Uhlenhake, Todd E Overland Park, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00