Composite braided open structure without inter-yarn bonding, and structures made therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10316443
APP PUB NO 20160305052A1
SERIAL NO

15130947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A braided, open structure composite made with large prepreg tow can be cured without bonding at the yarn crossovers and after removal from the mandrel, it can be used directly as a spring in which the spring constant in bending, torsion, tension or compression can be controlled by the geometry of the braided structure as well as the size of the structural elements. Alternatively the spring may be curved in multiple directions to form complex shapes and then crossovers can be re-bonded to make more rigid open structure composites that would be difficult or impractical to manufacture by conventional techniques.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUBURN UNIVERSITYOFFICE OF INNOVATION ADV AND COMMERCIALIZATION 570 DEVALL DRIVE SUITE 102 AUBURN AL 36832

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beale, David G Auburn, US 11 180
Branscomb, David J Statesville, US 4 48
Broughton,, Jr Royall M Auburn, US 4 46
Gurley, Austin R Auburn, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00