Inertial particle separator for air cycle machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10322621
APP PUB NO 20180229586A1
SERIAL NO

15433254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inertial particle separator includes a body with an outer wall, an inlet, an outlet, an inner nozzle, a settling chamber, a serpentine channel, and a filter element. The inlet is disposed on an upstream end of the body. The outlet is disposed on a downstream end of the body. The inner nozzle is disposed radially inward from the outer wall and forms a primary flow passage. The settling chamber is disposed in the body and extends between the outer wall and the inner nozzle. The settling chamber forms a secondary flow passage and is fluidly connected to the inlet and the outlet. The serpentine channel fluidly connects fluidly connects the inlet and the settling chamber and is disposed radially between the outer wall of the body and the inner nozzle. The filter element is disposed in the settling chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONFOUR COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Army, Donald E Enfield, US 120 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00