Method for making steel in an electric arc furnace and electric arc furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10337077
SERIAL NO

15108323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing steel by charging a furnace with scrap metal and agglomerated oxy-carbon material into a workspace of a furnace, to reduce specific electricity consumption when melting. Increasing the iron output quantity by inputting electric energy, fuel, a carburizer, a flux and gaseous oxygen, using electric arc melting with decarburization of a metal bath, and releasing metal and slag from the furnace. Prior to melting, a portion of the material is loaded with a first portion of the metal charge into the central zone of the furnace, and the remaining material into the melted charge during melting 0.5-10 kg/min per 1 megavolt-ampere of electric arc transformer power. The oxy-carbon material size is between 5 and 80 millimeters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOROFEEV GENRIKH ALEKSEEVICH33 KV 154 TULA 300001
ASHPIN NIKOLAI AULITSA DEMONSTRATSII DOM 2 KVARTIRA 122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dorofeev, Genrikh Alekseevich Tula, RU 5 8
Protopopov, Aleksandr Anatol'evich Tula, RU 1 0
Smirnov, Konstantin Gennadievich Moskovskaya obl., RU 2 1
Yantovskiy, Pavel Rudol'fovich Moskovskaya obl., RU 1 0
Yastrebov, Igor' Ivanovich Tula, RU 1 0
Zinyagin, Gennadiy Alekseevich Belgorodskaya obl., RU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00