Cyclonic condensing and cooling system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10345048
APP PUB NO 20170328643A1
SERIAL NO

15593579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus is provided for processing reusable fuel comprising a first-type cyclone cooler having a first configuration. The apparatus also provides one or more second-type cyclone coolers, wherein each one or more second-type cyclone coolers has a substantially identical second configuration to respective other one or more second-type cyclone coolers, wherein the second configuration is different than the first configuration. The apparatus may also provide an air cooled heat exchanger, a coil condenser and one or more bubblers. The first-type cyclone cooler and the one or more second-type cyclone coolers are connected. One of the one or more second-type cyclone coolers is connected to the air cooled heat exchanger. The air cooled heat exchanger is connected to the coil condenser. The coil condenser is connected to the one or more bubblers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOLDEN RENEWABLE ENERGY, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fowler, David Yonkers, US 71 11233
Oluwadare, Oluwaseun Yonkers, US 1 0
Tenore, Anthony F Yonkers, US 12 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00