Vehicle body structure for a two-track vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10350955
APP PUB NO 20180037079A1
SERIAL NO

15666937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle structure for a two-track vehicle provided with an auxiliary frame for a vehicle axle, in particular a rear axle, which is provided with a wheel suspension on the articulation points for wheel link on the superstructure side, which are connected to articulation points on the wheel carrier side, connected to a wheel carrier carrying a vehicle wheel, and which is equipped with a spring and/or damper unit, which is supported between a vehicle superstructure and the wheel suspension, wherein the wheel frame is connected to at least one auxiliary frame bearing in a manner that is decoupled from oscillations at the vehicle superstructure, and wherein the wheel and/or damping unit is equipped with a rotational damper. According to the invention, the auxiliary frame bearing is provided with a connection point at which is connected the rotational damper.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AUDI AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Langhoff, Hans-Jürgen Lenting, DE 13 53
Stiegler, Dominik Dietfurt, DE 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00