Picking system and picking method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10358291
APP PUB NO 20170233188A1
SERIAL NO

15502256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a picking system, commodities are efficiently transported to a picking area and a shipment area by one type of transportation vehicle travelling along a travelling route including a diverging section and a merging section. The picking system is provided with a transportation vehicle, racks, picking units, the shipment area, and a controller configured and programmed to control the transportation vehicle. The picking units are provided with a carrying-in station to which the transportation vehicle transports a container and a carrying-out station from which the transportation vehicle transports the container and the picked commodities. The transportation vehicle transports a container containing ordered commodities from the racks to a carrying-in station, the picked commodities to the shipment area, and a container after picking the commodities to the racks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MACHINERY LTD3 MINAMI OCHIAI-CHO KISSHOIN MINAMI-KU KYOTO-SHI KYOTO 601-8326

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tai, Akito Inuyama, JP 11 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00