Current interruption device and electricity storage device including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361422
APP PUB NO 20180183035A1
SERIAL NO

15577540

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current interruption device includes a conductive plate and a first deformable plate. The conductive plate includes a center portion and a peripheral portion surrounding the center portion. An upper surface of the center portion is formed in a planar shape spreading in a first direction and a second direction orthogonal thereto in a conductive state. The peripheral portion includes an inclined portion extending outward from a boundary between the center portion and the peripheral portion. An upper surface of the inclined portion is inclined so as to increase a distance to the first deformable plate as the upper surface of the inclined portion becomes farther away from the center portion when the conductive plate and the first deformable plate are viewed along the first direction or the second direction in the conductive state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EAGLE INDUSTRY CO LTDMINATO-KU TOKYO 105-8587

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyoshi, Norimitsu Tokyo, JP 6 14
Hirose, Takayuki Kariya, JP 93 403
Iwa, Toshiaki Tokyo, JP 37 491
Kurita, Mikiya Kariya, JP 12 65
Mitsuyasu, Makoto Tokyo, JP 6 14
Ogawa, Yoshihiro Tokyo, JP 208 2536
Oide, Ryuji Kariya, JP 9 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00