Composite comprising a mineral wool comprising a sugar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10364183
APP PUB NO 20170144912A1
SERIAL NO

15301864

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for the preparation of a shaped composite, comprising the preparation of a mixture into which fragments of mineral wool comprising a size comprising a sugar, a non-cement silica carrier distinct from the wool, a non-cement alkali metal carrier distinct from the wool, and water, are introduced, the non-cement silica carrier and the non-cement alkali metal carrier forming, with the water, a mineral binder which gradually solidifies around the solid particles present in the mixture, and then the shaping of the mixture into a shaped composite, in particular into briquettes. The invention also relates to a process for the manufacture of mineral wool, in which a molten mass is produced which is converted into mineral wool by means of a fiberizing device, the shaped composite being introduced as vitrifiable charge into a melting chamber, such as a cupola furnace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAINT GOBAIN ISOVER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bouny, Elodie Lattes, FR 4 65
Obert, Edouard Fleurines, FR 22 181
Yammine, Joumana Paris, FR 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00