Control system of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10364771
APP PUB NO 20170292463A1
SERIAL NO

15482041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A main injection of fuel from a fuel injector into a combustion chamber is made to auto-ignite. During the compression stroke after the main injection and before the auto-ignition of the fuel injected during the main injection, a first auxiliary injection and a second auxiliary injection are successively injected from the fuel injector. By controlling the injection timing of the first auxiliary injection, the ignition timing of a spark plug, and the injection timing of the second auxiliary injection, the fuel injected during the first auxiliary injection is made to burn by flame propagation combustion by the ignition action of the spark plug, the fuel injected during the second auxiliary injection is made to be injected inside the flame propagation combustion region, and the fuel injected during the second auxiliary injection is made to burn by diffusive combustion before auto-ignition of the fuel injected during the main injection occurs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • C/O TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ochi, Yuta Susono, JP 18 90

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00