Mid-bus voltage generation via idle phases in a linear motor track system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10367404
APP PUB NO 20190103800A1
SERIAL NO

15720353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Drive coils in sections of a linear motor track that are normally used to electromagnetically propel movers along the track when such movers are nearby can be used to generate a mid-bus voltage for the section when not being used to propel movers. Such drive coils not being used to propel movers are considered “idle” and available for mid-bus voltage generation. The mid-bus voltage, and a full-bus voltage from which the mid-bus voltage is derived, in turn, can be applied across other drive coils that are near movers with varying polarities and magnitudes to propel movers along the track. Track sensors can be positioned along the track to detect presences or absences of movers with respect to drive coils for determining propulsion of such movers or generation of the mid-bus voltage. Accordingly, power supplies can be used more efficiently by not requiring them to generate mid-bus voltages in addition to full-bus voltages and DC references.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION TECHNOLOGIES INC1 ALLEN-BRADLEY DRIVE MAYFIELD HEIGHTS OH 44124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffman, Jonathan D Milwaukee, US 13 8
Ozimek, Patrick E Milwaukee, US 20 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00