Controlled kiln and manufacturing system for biochar production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10370593
APP PUB NO 20150136581A1
SERIAL NO

14378357

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controlled kiln and manufacturing system for biochar production, including control systems and subsystems. An example controlled kiln (100) includes a drum (200), a lid (120) and a floor (250) together forming a combustion chamber configured to contain feedstock for conversion into biochar. A catalytic converter (700) may be operatively coupled with an outlet of the kiln (100). A conversion process completion detection subsystem may be operative to issue notifications. An example biochar manufacturing system includes at least one of the controlled kilns (100), a feedstock filling station (1010, 1020, 1030) for providing feedstock to kiln 100, a firing line (1040) for receiving the kiln containing feedstock, a tipping station (1050) for receiving biochar from the kiln, a biochar sizing station, and an automated handler (800) configured to move the kiln between the feedstock filling station (1010, 1020, 1030), the firing line (1040) and the tipping station (1050).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOCHAR NOW LLC2409 LAKE DRIVE LOVELAND CO 80538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aupperle, Donald P Seattle, US 25 354
Beierwaltes, Benjamin M Longmont, US 8 124
Beierwaltes, William T Loveland, US 20 280
Gaspard,, II James G Loveland, US 17 216
Olander, Mikel S Johnstown, US 8 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00