Machine for cutting the tips of the leaves off agave plants and preparing the plants for the removal of the core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10375895
APP PUB NO 20160057939A1
SERIAL NO

14786469

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine for cutting the tips of the leaves off agave plants to prepare the plants for the subsequent removal of the core. The machine includes a chassis defining a platform having: a rear end having a structural frame supporting arms that project rearwards, wheel rims that rest on the ground being secured to said arms; a front end having a structural frame having arms extending frontwards, a tractor-coupled drawbar being secured to said arms; and an arm that connects to the power take-off and is secured in the upper part of the structural frame. The machine includes a supporting base which can slide under the action of hydraulic elements, and is mounted on a pair of parallel rails and is arranged transversely across the platform. Additionally, the machine includes a hydraulic system with control inputs, actuated by the operator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAVARRO VELASCO RUBÉNGUADALAJARA JALISCO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Navarro, Velasco Ruben Guadalajara, MX 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00