Gas turbine and pressurized water reactor steam turbine combined circulation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10378389
APP PUB NO 20190170020A1
SERIAL NO

16231496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a gas turbine and pressurized water reactor steam turbine combined circulation system, using a heavy duty gas turbine and a pressurized water reactor steam turbine to form a combined circulation system. Heat of the tail gas of the gas turbine is utilized to raise the temperature of a secondary circuit main steam from 272.8° C., and the temperature of the secondary circuit main steam slides between 272.8° C. and 630° C. according to different pressurized water reactor steam yields and different input numbers and loads of the heavy duty gas turbine. The system has a higher heat efficiency than that of the pressurized water reactor steam turbines in the prior art; and as for the electric quantity additionally generated by gas, the heat efficiency of the system is also significantly higher than that of gas-steam combined circulation in the prior art.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHANG LIDAO253024 ROOM 3 BUILDING 10 HUANENG DEZHOU POWER PLANT HUAXING ROAD NO 101 HUAXING ROAD SHANDONG DEZHOU DEZHOU CITY A FOLK ART FORM POPULAR IN SHANDONG 253024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Lidao Shandong, CN 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00