Steering responsive speed-controlled buggy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10384704
APP PUB NO 20180346007A1
SERIAL NO

15981296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steerable, self-propelled cart for safely delivering heavy loads, such as concrete, within job sites with unlevel, irregular, or sloped terrain. A cargo bucket is tiltable over front drive wheels for transporting and dumping cargo. Hydraulic drive motors driven by a hydraulic pump propel rear wheels at a selectable speed. Steering handlebars rotate a steering column that turns the rear wheels. A throttle cable extending from the handlebars controls the throttle setting by pivoting a throttle lever mounted on the hydraulic pump. Limiting linkages extend from flanges on an anchor bracket secured to the steering column to a bridge on the throttle lever. As the steering column rotates, the limit linkages are wound partially about it, pivoting the throttle lever by pulling on the bridge, reducing pump speed. Heavy steering displacements will retract the throttle lever to reduce cart speed notwithstanding the previous speed setting chosen by the operator via the cable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLEN ENGINEERING CORPORATIONP O BOX 819 PARAGOULD AZ 72451

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fielder, Jeffrey Lynn Jonesboro, US 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00