Delayed coking plant combined heating and power generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10385275
APP PUB NO 20170327747A1
SERIAL NO

15664949

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a heat exchange system and a power generation system. The heat exchange system includes first, second, and third heat exchangers each operable as a continuous source of heat from a delayed coking plant. The first and second heat exchangers heat first and second fluid streams to produce heated first and second fluid streams, respectively. The heated second fluid stream has a lower temperature and a greater quantity of heat than the heated first fluid stream. The third heat exchanger heats a third fluid stream to produce a heated third fluid stream that includes the heated first fluid stream and a hot fluid stream. The heated third fluid stream has a lower temperature than the heated first fluid stream. The power generation system generates power using heat from the heated second and third fluid streams.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al, Saed Hani Mohammed Jubail Ind., SA 32 263
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00