Multilayer ceramic electronic component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10395836
APP PUB NO 20170352486A1
SERIAL NO

15611884

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic electronic component includes a laminated body, a first external electrode, a pair of second external electrodes, and a pair of insulating coating portions. The pair of insulating coating portions extends in a laminating direction between each of the pair of second external electrodes and the first external electrode on a second principal surface, from the second principal surface to respective portions of a first side surface and a second side surface. As viewed from at least one direction in the laminating direction, an end of the pair of insulating coating portions, which is located closest to a first principal surface, is located closer to the first principal surface than an end of the first external electrode and pair of second external electrodes, which is located closest to the first principal surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDNAGAOKAKYO-SHI KYOTO 617-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Yasuo Nagaokakyo, JP 94 849
Kayatani, Takayuki Nagaokakyo, JP 14 161
Sawada, Takashi Nagaokakyo, JP 154 1736

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00