System with orbiting axis for converting energy

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10408193
APP PUB NO 20170335826A1
SERIAL NO

15533616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system with orbiting axis for converting energy from a fluid includes an inner transmission shaft and an output transmission shaft; a sectorial blade configured to exchange energy with the fluid and connected to the inner transmission shaft by a support element pivotable such that the blade is configured to rotate around an axis of the inner transmission shaft; a for synchronization and transmission of rotation-oscillation movement of the blade and including the inner transmission shaft and the output transmission shaft. The support element is hinged to the inner transmission shaft by a first rotator rigidly connected, at a first extremity, with the support element by a pin and, at a second extremity, to one of the transmission shafts, each blade being configured to perform the rotation-oscillation movement integrally with the support element and always oriented in the direction of the fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BERNARDI UBALDONot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernardi, Ubaldo Roccabernarda, IT 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00