Method for forming a structural panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10414481
APP PUB NO 20180229829A1
SERIAL NO

15431895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

During a method for forming a structural panel, a core structure is formed that includes a plurality of corrugated ribbons and a plurality of walls. Each of the corrugated ribbons is laterally between a respective adjacent pair of the walls. Each of the corrugated ribbons includes a plurality of baffles and a plurality of porous septums. Each of the porous septums is longitudinally between a respective adjacent pair of the baffles. The forming of the core structure includes bonding a first of the walls to a first of the corrugated ribbons and subsequently bonding a second of the walls to the first of the corrugated ribbons. The core structure is bonded to a first skin. The core structure is bonded to a second skin. The core structure is vertically between the first skin and the second skin, and the first skin is configured with a plurality of perforations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROHR, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gurney, Andrew S San Diego, US 6 17
Listak, Raymond R Chula Vista, US 6 28
Pierick, David E San Diego, US 12 257

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00