Method and a system for supporting a frame of a mineral material crusher and a crushing plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10434518
APP PUB NO 20160121338A1
SERIAL NO

14893161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a system for supporting a frame of a mineral material crusher on a body of a crushing plant and a mineral material processing plant. The crusher frame is supported by first support devices in place in relation to the body of the crushing plant at first support points and by at least two second support devices at second support points. The second support device has an adjusting member between the crusher frame and the body of the crushing plant, and at least one second support device is configured to move the frame of the crusher vertically in relation to the body of the crushing plant. The adjusting member has a cylinder and a piston inside the cylinder which define an adjusting volume therebetween. A pressure is formed from a load above the adjusting member and is arranged to form into the adjusting volumes of the adjusting members.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • METSO MINERALS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jonkka, Jari Kangasala, FI 9 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00