Actuator and linear motion module

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10439480
APP PUB NO 20170331358A1
SERIAL NO

15204331

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An actuator is provided, including a fixed assembly and a movable assembly. The fixed assembly includes a coil module, a base, a first screwing member, and a linear rail. The first screwing member passes through the base and the linear rail, and the linear rail is positioned on the base. The movable assembly includes a U-shaped back board having an inner space, a first magnetic module, a second magnetic module aligned with the first magnetic module, and a sliding block. The first and second magnetic modules are disposed on the U-shaped back board and accommodated in the inner space. The coil module is disposed between the first magnetic module and the second magnetic module. The sliding block is positioned on the U-shaped back board in the inner space, and slidably connected to the linear rail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DELTA ELECTRONICS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chun-Hsiu Taoyuan, TW 2 0
Chen, Po-Tzu Taoyuan, TW 5 1
Chu, En-Yi Taoyuan, TW 16 15
Chung, Chi-Wen Taoyuan, TW 28 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00