Fan motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10447106
APP PUB NO 20180175696A1
SERIAL NO

15832776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fan motor according to the present invention comprises a rotor 10 which rotates together with a shaft 30; a stator 20 which is installed to be oriented towards the rotor 10; a top-covering bracket 60 which is coupled to an upper insulator 21 and a core 22 constituting the stator 20; a motor bracket 80 which is mounted on a fixed-installation bracket 70 and coupled to the core 22, upper insulator 21 and lower insulator 23 of the stator 20 and a printed circuit board 50; and a sealing element 100 which is filled in a space portion S formed between a lower surface of the printed circuit board 50 coupled to the bottom of the lower insulator 23 and an inner lower surface of the motor bracket 80.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEW MOTECH CO LTD8 HANAMSANDAN 7BEON-RO GWANGSAN-GU GWANGJU 62216

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Woo Sung Gwangju, KR 6 4
Jang, Jeong Cheol Gwangju, KR 74 124
Park, Gyeong Su Gwangju, KR 14 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00