Modular light weight construction system based on pre-slotted panels and standard dimensional splines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10450736
APP PUB NO 20190242109A1
SERIAL NO

15987366

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Modular building methods and systems using lightweight foam modular panels which are based on fractal geometry. Each panel includes one or more channels formed through the foam body, where the channels are centered between adjacent fractal modules of the overall modular panel. The channels are configured to receive splines (e.g., dimensional lumber) therein. The entire system is based on dimensional lumber sizing. The rectangular panels include a pre-cut slot extending through one face, to the channel, while a score line is formed in the opposite face, aligned with the pre-cut slot of the opposite face. The panels may be easily and quickly cut with a box knife to reduce the number of fractal modules in a given panel, to provide a smaller panel still based on such fractal geometry. Such a cut is made along the score line, where the foam is no more than 2 inches thick.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BLUE TOMATO, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morrow, Brian D Provo, US 14 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00