Control device for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10450980
APP PUB NO 20150204259A1
SERIAL NO

14410996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

During a fuel cut-off control, if a vehicle deceleration rate becomes greater than a rapid deceleration determination value, which is calculated based on a rotational resistance of internal combustion engine 1, a vehicle is determined to be in a state of rapid deceleration. The rapid deceleration determination value is set to decrease as the rotational resistance of internal combustion engine 1 increases. The rotational resistance thereof increases as the vehicle speed decreases, and increases as a transmission gear ratio increases. Thereby, during decelerating on a high vehicle speed side, an erroneous determination of rapid deceleration due to a longitudinal vibration of the vehicle that occurs when the fuel cut-off control starts can be prevented, and during decelerating on a low vehicle speed side, a determination of rapid deceleration can be implemented to terminate the fuel cut-off control and thereby prevent the internal combustion engine 1 from being stopped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTD2 TAKARA-CHO KANAGAWA-KU YOKOHAMA KANAGAWA 220-8623

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hase, Takamitsu Isehara, JP 5 40
Tsubaki, Kenichi Shimotsuke, JP 5 3
Yoichi, Mitsuru Yokohama, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00