Solid fuel burning system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10451272
APP PUB NO 20160201900A1
SERIAL NO

14912872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid fuel burning system and method with a wick having a bridge is provided. The system has a melted wax reservoir, a melting grate, and the wick. The melting grate is configured to receive a solid wax. The melting grate located above at least a portion of the melted wax reservoir so that wax melted on the melting grate can be received into the melted wax reservoir. The wick has a perimeter wall, a hollow core, the bridge, and an upper exit opening in communication with the hollow core. The bridge extends across the hollow core between a first portion and a second portion of the perimeter wall. A solid fuel burning system and method with an electronic ignition system is also provided having a power source, a filament, and a filament support. The filament support positions the filament adjacent the wick or bridge within the hollow core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASTERSON ENTERPRISES INC2000 BLOOMINGDALE RD #100 GLENDALE HEIGHTS IL 60139

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masterson, Daniel J Geneva, US 14 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00