Modular processing facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10458140
APP PUB NO 20150292223A1
SERIAL NO

14747727

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The various processes of a plant are segmented into separate process blocks that are connected to one another using fluid conduits or electrical connections. Each process block is specialized to perform specific tasks in an assembly line manner to achieve an overall goal. For example, multiple distillation process blocks could be daisy-chained to create fuel from crude oil. Each process block is generally small enough to be mounted on a truck or a flatbed for easy transport, allowing for an assembly line of process blocks to be transported anywhere in the world with ease.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLUOR TECHNOLOGIES CORPORATION3 POLARIS WAY ALISO VIEJO CA 92698

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Donovan, Gary Canmore, CA 6 38
Halvorsen, Sean Calgary, CA 6 38
Haney, Fred Calgary, CA 7 53
Lowrie, Alan Calgary, CA 6 38
Lucchini, Simon Calgary, CA 6 38
Morlidge, George Okotoks, CA 6 38
Roth, Todd Calgary, CA 8 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00