Electric machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10461592
APP PUB NO 20170338705A1
SERIAL NO

15487411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor has a first carrier having an array of electromagnetic elements and a second carrier having electromagnetic elements defining magnetic poles. The first and second carriers each define an axis. An airgap is formed between the first and second carriers when in an operational position. An inner thrust bearing connects the first and second carriers and is arranged to allow relative rotary motion of the carriers. An outer thrust bearing connects the first and second carriers and is arranged to allow relative rotary motion of the carriers. The electromagnetic elements of each of the first and second carriers are arranged radially inward of the outer thrust bearing and radially outward of the inner thrust bearing. The inner thrust bearing and the outer thrust bearing are arranged to maintain the airgap against a magnetic attraction of the electromagnetic elements of the first and second carriers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENESIS ROBOTICS AND MOTION TECHNOLOGIES CANADA ULC6279 202 ST UNIT 2 LANGLEY V2Y1N1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Klassen, James Brent Surrey, CA 58 271
Pope, Bradley Christopher Langley, CA 3 11
Spasov, Damian Port Moody, CA 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00