Sprocket driven conveyor belt link and conveyor belt assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10464757
APP PUB NO 20160185529A1
SERIAL NO

14986497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyor belt link that can form a substantially flat, continuous conveyor belt surface when coupled with multiple, identical conveyor belt links. In one embodiment, the conveyor belt link for a conveyor belt assembly comprises a base for carrying an item, the base having a first end, a second end, a first linking member projecting from the base, and a second linking member projecting from the base. The first end of the base terminates at a first angle (relative to a horizontal axis), the second end terminates at a second angle (relative to the horizontal axis), and the first and second angles of the ends are substantially supplementary. The first linking member comprises one of a cylinder and a channel and the second linking member comprises the other of the cylinder and the channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARMON FOODSERVICE TECHNOLOGIES INC101 BROADWAY STREET WEST SUITE 200 OSSEO MN 55369

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bauer, Richard Palatine, US 44 411

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00