Combined device for electrical protection against transient overvoltages and monitoring of an electrical installation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10468874
APP PUB NO 20170012425A1
SERIAL NO

15113121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention refers to a combined device for electrical protection against transient overvoltages and monitoring of an electrical installation, of those used in installations with alternating single-phase or multi-phase current, or direct current, of those formed by cartridges plugged in to a fixed base or formed by a monoblock, both types of devices comprising one or more components for overvoltage protection in each plug-in cartridge or in the monoblock, characterised in that it comprises monitoring means configured so that they continuously measure and process one or several parameters related to the state of the electrical installation and the protective device itself, and connected to said monitoring means a series of indication means configured to indicate one or a combination of output parameters are comprised.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CIRPROTEC, S.L.; MERSEN USA NEWBURYPORT-MA, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martin, Peidro Jose Antonio Terressa, ES 1 0
Pons, Gonzalez Carles Terressa, ES 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00