Rope made of textile fiber material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10472765
APP PUB NO 20170328001A1
SERIAL NO

15524569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a rope (1) made of textile fibre material, which is characterized by the combination of features whereby

    a) the load-bearing fibre material of the rope (1) consists of high-strength synthetic fibresb) the rope (1) is in the form of a spiral strand ropec) the rope (1) has at least two, preferably at least three concentric load-bearing strand layers (3,4,5)d) the individual strands (7,8,9,10,11,12) of the strand layers (3,4,5) are movable with respect to one anothere) the degree of filling of the rope (1) with textile fibre material is ≥75%, preferably ≥85%f) the outermost ply (5,6) of the rope has a coefficient of friction μ with respect to steel of μ<0.15.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TEUFELBERGER FIBER ROPE GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baldinger, Peter Schwertberg, AT 9 30
Ernst, Björn Linz, AT 8 17
Kaiser, Gunter Thalheim/Wels, AT 12 78
Kirth, Rudolf Vöcklabruck, AT 17 63
Rührnössl, Erich Haid, AT 8 15
Traxl, Robert Ebensee, AT 8 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00