System and method for fault ride through

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10476264
APP PUB NO 20170141570A1
SERIAL NO

15343333

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution system in operative association with a source and a plurality of loads includes a converter, a power distribution unit including a plurality of solid state power controllers and configured to provide power from converter to plurality of loads, and a fault protection unit operatively coupled to converter, power distribution unit, or both. The fault protection unit includes a sensor configured to sense current at output terminal of at least one of power distribution unit and converter and a controller configured to compare sensed current with a corresponding threshold value of current, identify presence of a fault in at least one of plurality of loads, power distribution unit, and converter based on comparison, and activate a desired protection scheme to provide fault ride through during the presence of the fault.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Collins, John Oliver Cheltenham, GB 16 4
Mahadeva, Iyer Vishnu Raleigh, US 4 2
Prabhakaran, Satish Albany, US 20 72
Vijayan, Pradeep Karnataka, IN 22 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00