Method for operating blast furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10487370
APP PUB NO 20180044745A1
SERIAL NO

15554927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a method for operating a blast furnace with which the combustion efficiency of a solid fuel, such as pulverized coal, is improved, thereby making it possible to improve productivity and reduce CO2 emissions. Pulverized coal and LNG are blown from an upstream lance configured by a double tube, and oxygen is blown from a downstream lance on the downstream side in a hot air blast direction, so that oxygen used for preceding combustion of the LNG is supplied from the downstream lance, and the pulverized coal whose temperature has been increased by the combustion of the LNG is combusted along with the supplied oxygen. When a direction perpendicular to the hot air blast direction is designated as 0°, and a downstream direction and an upstream direction therefrom in the hot air blast direction are designated as positive and negative, respectively, a blowing direction of the oxygen from the downstream lance with respect to the blast direction ranges from −30° to +45°, and a blowing position of the oxygen from the downstream lance with reference to a position at which the upstream lance is inserted into a blast pipe ranges from 160° to 200° in terms of a blast pipe circumferential direction angle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawashima, Tomoyuki Tokyo, JP 14 48
Murao, Akinori Tokyo, JP 10 23
Ooyama, Nobuyuki Tokyo, JP 2 2
Yamamoto, Naoki Tokyo, JP 377 4138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00