Apparatus and method for controlling construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10487477
APP PUB NO 20180195254A1
SERIAL NO

15741645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an apparatus and method for controlling a construction machine. An apparatus for controlling a construction machine according to an embodiment of the present invention may compare a fuel efficiency gain expected when engine revolutions per minute (RPM) is decreased with a fuel efficiency gain expected when a current torque curve is changed to a torque curve corresponding to a condition in which auxiliary power is provided and selected from among the plurality of torque curves and then the latter torque curve is selectively applied, based on the fuel efficiency map, and may control an engine by means of a method by which a larger fuel efficiency gain is expected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTD489 INJUNG-RO DONG-GU INCHEON 22502 22502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Byoung Heon Incheon, KR 2 6
Yun, Hong Cheol Guri-si, KR 8 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00