Remote natural gas supply station using LNG tank container and method for supplying natural gas using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10487984
APP PUB NO 20160053944A1
SERIAL NO

14783021

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A natural gas supply station includes an installation structure on which an LNG tank container is installed and a gas vaporizer that receives a liquefied natural gas from the LNG tank container to vaporize the liquefied natural gas. The installation structure includes a moving part reciprocatively moving in a direction in which the LNG tank container is unloaded from a transport unit, and the moving part is separably fixed to the LNG tank container to move the LNG tank container loaded on the transport unit to the installation structure or the LNG tank container loaded on the installation structure to the transport unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA GAS CORPORATION120 CHEOMDAN-RO DONG-GU DAEGU 41062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Kyoung-Shik Ansan-si, KR 3 24
Ha, Jong-Mann Ansan-si, KR 1 3
Hong, Seong Ho Gwacheon-si, KR 17 123
Kim, Hyoung Sik Uiwang-si, KR 16 24
Kim, Ki-Dong Incheon, KR 39 88
Oh, Young Sam Incheon, KR 11 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00