Thermal desalination for increased distillate production

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10508043
SERIAL NO

14576798

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A superstructure for thermal desalination is optimized by controlling various parameters, wherein the variable parameters include a feed routing for flow of a liquid feed; brine routings for flow of concentrated brine from the liquid feed; vapor routings for vapor generated from the liquid feed; a series of multi-effect distillation effects, each of the effects coupled with at least one routing selected from the feed routing and the brine routings and with one of the vapor routings; and a series of multi-stage flash stages coupled with at least one routing selected from the feed routing and the brine routings and with one of the vapor routings. The superstructure may or may not contain a thermal vapor compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASSACHUSETTS INSTITUTE OF TECHNOLOGY77 MASSACHUSETTS AVENUE CAMBRIDGE MA 02139
RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHENTEMPLERGRABEN 55 AACHEN 52056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dahdah, Tawfiq Hanna Boston, US 1 2
Mitsos, Alexander Aachen, DE 6 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00