Substrate processing apparatus and guide portion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10513774
APP PUB NO 20160298235A1
SERIAL NO

15191151

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cleaning method includes (a) providing a process chamber after forming an oxide film on a substrate in the process chamber formed by a reaction tube and a manifold supporting the reaction tube by performing a cycle a predetermined number of times, the cycle including supplying a source gas to the substrate through a first nozzle in the manifold extending upward to an inside of the reaction tube, and supplying an oxidizing gas to the substrate through a second nozzle in the manifold extending upward to the inside of the reaction tube; and (b) cleaning an inside of the process chamber. The step (b) includes a first cleaning process of supplying a hydrogen fluoride gas into the reaction tube through the second nozzle; and a second cleaning process of supplying a hydrogen fluoride gas onto an inner wall surface of the manifold through a third nozzle disposed in the manifold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOKUSAI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akae, Naonori Toyama, JP 52 2018
Horita, Hideki Toyama, JP 22 748
Terasaki, Masato Toyama, JP 27 1363

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00