Terminal and method of manufacturing a terminal

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10516245
SERIAL NO

15255838

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a terminal comprising, in the following order, preparing a sheet material comprising 0.005 mass %-3.000 mass % in total of at least one element selected from Mg, Si, Cu, Zn, Mn, Ni, Cr and Zr, the balance being Al and incidental impurities, performing solution heat treatment by heating the sheet material, cold rolling the solution heat treated sheet material, forming a metal coating layer over a part of or an entirety of the cold-rolled sheet material, the metal coating layer being composed primarily of Sn, Cr, Cu, Zn, Au or Ag, or an alloy composed primarily thereof, forming a developed terminal material by punching the sheet material into a developed view geometry of a terminal, forming the developed terminal material into a terminal, and performing an aging treatment on the terminal at 150-190° C. for 60-600 minutes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FURUKAWA ELECTRIC CO., LTD.; FURUKAWA AUTOMOTIVE SYSTEMS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuo, Ryosuke Tokyo, JP 22 226
Mitose, Kengo Tokyo, JP 52 841

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00