Gas clean-up unit and gas purification method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10518210
SERIAL NO

16321946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas clean-up unit includes a first conversion unit configured to perform a first conversion process of converting hydrogen cyanide contained in gas to be treated to ammonia, in presence of a first catalyst and at a first predetermined temperature; a second conversion unit configured to perform a second conversion process of converting carbonyl sulfide in the gas that has been subjected to the first conversion process to hydrogen sulfide, in presence of a second catalyst and at a second predetermined temperature lower than the first predetermined temperature; a cleaning unit configured to perform a cleaning process of bringing the gas into gas-liquid contact with cleaning liquid to remove the ammonia by cleaning; and a desulfurization unit configured to absorb and remove hydrogen sulfide in the gas by bringing the gas that has been subjected to the cleaning process into gas-liquid contact with absorbent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirayama, Haruaki Tokyo, JP 26 78
Kakesako, Seiji Hiroshima, JP 9 6
Kan, Rikio Hiroshima, JP 10 3
Yoshida, Kaori Tokyo, JP 52 221

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00