Thermal desorption system and method for oil-contaminated soil and gravel using microwave indirect irradiation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10518303
SERIAL NO

16096289

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a thermal desorption system for oil-contaminated soil and gravel, using a microwave indirect irradiation method and including a microwave emission prevention device and a preheating device using waste heat, and a thermal desorption method for oil-contaminated soil and gravel, using the same. In addition, it is disclosed that an outer tube encompassing an inner tube extends to both sides and a plurality of ring-shaped microwave attenuation units are arranged on the inner circumferential surface of the outer tube, such that microwaves are prevented from leaking between the inner tube and the outer tube, thereby enabling eco-friendliness, and even the waste heat generated during a pollutant desorption process is utilized in the system itself, thereby enabling economic feasibility to increase further.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOREA RAILROAD RESEARCH INSTITUTE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koh, Tae Hoon Uiwang, KR 4 7
Lee, Dong Geun Uiwang, KR 68 400
Yoo, Han Ju Uiwang, KR 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00