Low load turndown for combined cycle power plants

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10519816
SERIAL NO

15518437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined cycle power unit (10) including a gas turbine (16), a heat recovery steam generator (HRSG) (34) to generate steam from an exhaust flow (24) of the gas turbine (16), and a steam turbine (64) driven by the steam generated from the HRSG (34). Steam generated in an evaporator (50) in the HRSG (34) is conveyed through an upstream superheater stage (46a) and a downstream superheater stage (46b) in the HRSG (34). The steam is then conveyed from the downstream superheater stage (46b) to the steam turbine (64). Between the upstream and downstream superheater stages (46a, 46b), the steam flow from the upstream superheater stage (46a) is throttled to a lower pressure to form a reduced pressure steam flow prior to entering the downstream superheater stage (46b) where the steam is reheated to an elevated temperature at the reduced pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KG81739 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Briesch, Michael S Orlando, US 25 584
Cooney, James Oviedo, US 2 0
Johnson, Ray L Chuluota, US 2 1
McLaurin, Keith B Orlando, US 2 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00