System for demand response dispatch employing weather induced facility energy consumption characterizations

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10520968
SERIAL NO

15903596

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for dispatching buildings in a demand response program event including generating data sets for each of the buildings, each set having energy consumption values along with corresponding time and outside temperature values, where the energy consumption values within each set are shifted by one of a plurality of lag values relative to the corresponding time and outside temperature values, and where each of the plurality of lag values is different from other ones of the plurality of lag values; performing a machine learning model analysis on each set to yield machine learning model parameters and a residual; determining a least valued residual from all residuals yielded, the least valued residual indicating a corresponding energy lag for the each of the buildings; and using energy lags for all of the buildings to generate a dispatch schedule for the demand response program event according to a prioritization of the energy lags.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ENEL X NORTH AMERICA, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Mohssen, Husain Dedham, US 57 615
Bassa, Angela S Stoneham, US 50 559
Paradis, Richard R Franklin, US 30 379

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00