Nuclear fuel pebble and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10522255
SERIAL NO

15618305

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing nuclear fuel elements may include: forming a base portion of the fuel element by depositing a powdered matrix material including a mixture of a graphite material and a fibrous material; depositing particles on the base portion in a predetermined pattern to form a first particle layer, by controlling the position of each particle in the first particle layer; depositing the matrix material on the first particle layer to form a first matrix layer; depositing particles on the first matrix layer in a predetermined pattern to form a second particle layer by controlling positions of each particle in the second particle layer; depositing the matrix material on the second particle layer to form a second matrix layer; and forming a cap portion of the fuel pebble by depositing the matrix material. The particles in the first particle layer and the second particle layer include nuclear fuel particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
X-ENERGY LLC801 THOMPSON AVENUE SUITE 300 ROCKVILLE MD 20852

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pappano, Peter Poolesville, US 5 8
van, Staden Martin Annapolis, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00