Nuclear power generation system utilizing thermal expansion in metallic members to move a neutron reflector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10522259
SERIAL NO

15329646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear power generation system being safe and easily controlled by load following. The nuclear power generation system has a nuclear reactor employing a load following control method. The reactor includes: a fuel assembly reactor core having metallic fuel containing at least one selected from uranium-235, uranium-238 and plutonium-239; a reactor vessel containing the reactor core; metallic sodium loaded into the reactor vessel and heated by the reactor core; and a neutron reflector for achieving criticality in the reactor core with effective multiplication factor of neutrons emitted from the reactor core being maintained at or above about 1. The neutron reflector is coupled to spring or spiral metallic members and utilizing heat deformation in the metallic members due to the temperature in coolant metallic sodium to control the fast neutron reflection efficiency of the neutron reflector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLEAR INCTOKYO 116-0011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sumita, Osao Tokyo, JP 17 371
Ueno, Isao Tokyo, JP 7 56
Yokomine, Takehiko Onojo, JP 5 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00