Method for production of electrical machine stator comprising preforming step, and corresponding wound stator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10523095
SERIAL NO

15304769

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention essentially relates to a method for the production of a winding of a stator (15) comprising a body equipped with slots (28), comprising: a supply step consisting in supplying a winding unit with a bundle of conductors (37); and a pre-forming step consisting in moving the winding unit in relation to the bundle of conductors (37), such as to obtain a bundle of conductors (37) having, for each phase winding (E1-E6), at least two loop structures (39) and at least three segment structures (38), two of the segment structures (38) being positioned such that they can be disposed in the same slot (28) of the stator (15) and the two loop structures (39) connecting said two segment structures (38) stacked on the third segment structure (38).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VALEO EQUIPMENTS ELECTRIQUES MOTEUR

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Darras, Ludovic Montreuil sur Mer, FR 7 18
Duquesne, Jean Stella-Plage, FR 10 39
Even, Denis Paris, FR 23 207
Ramet, Vincent Etaples, FR 15 20
Sapotille, Larry Limeil Brevannes, FR 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00