Quartz crystal resonator and method for manufacturing the same, and quartz crystal resonator unit and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10523173
SERIAL NO

15673940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a quartz crystal resonator that includes a quartz crystal blank having a vibrating portion including a center of a principal surface of the quartz crystal blank when viewed in plan from a direction normal to the principal surface and a peripheral portion adjacent to the vibrating portion, a pair of excitation electrodes disposed opposite to each other with the vibrating portion interposed therebetween, a pair of electrode pads disposed on the peripheral portion, and a pair of extended electrodes each extending from the vibrating portion to the peripheral portion to electrically connect one excitation electrode to a corresponding electrode pad, where the method includes conducting a first trimming of the vibrating portion and the peripheral portion; and conducting a second trimming of part of one of the excitation electrodes on the vibrating portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sai, Koki Nagaokakyo, JP 10 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00